We have established ourselves as a trusted partner for homeowners, businesses, construction companies, and other key players in the electrical services industry, offering reliable and efficient solutions for all your electrical needs.
- October 01, 2025

Project Overview
Cubeko Electrical was appointed to deliver a full CAT B electrical installation for Rocket Fibre Ltd, covering office accommodation, warehouse space, communal areas, and dedicated data environments.
The project required a high level of coordination, technical accuracy, and future-proof design to support critical infrastructure and business operations.
Scope of Works
CAT B Office & Warehouse Fit-Out
- Full electrical installation to CAT B standard
- LED lighting throughout offices, warehouse, and shared areas
- Small power, floor boxes, and perimeter containment
- Installations designed to support flexible workspace layouts
Data & Network Infrastructure
- Complete CAT6A structured cabling installation
- Data cabinets, patching, and termination
- Network infrastructure designed for high performance and scalability
Fire & Life Safety
- Grade A LD1 fire alarm system installed throughout
- Full coverage of all occupied spaces and escape routes
- System designed and installed in line with current British Standards
Security & Access Control
- Paxton 10 access control system installed
- Controlled access to offices, data areas, and restricted zones
- Integrated solution to support site security and staff movement
Power Resilience & Critical Systems
- UPS backup system installed to protect data halls
- Power continuity designed for critical IT and network equipment
- Supporting infrastructure installed with resilience and future expansion in mind
Data Centre Design & Installation
- Electrical infrastructure for server racks and data cabinets
- Clean, organised containment and power distribution
- Design-led approach focused on reliability, access, and long-term performance
Result
The completed installation provides Rocket Fibre Ltd with a robust, secure, and future-ready environment, capable of supporting critical data operations alongside modern office and warehouse use. The project was delivered to specification with a strong emphasis on compliance, resilience, and clean workmanship throughout.